Monday, April 25, 2016
Aibak (BNA) A huge bridge which connected Samangan to Balkh province due to recent floods was destroyed and will be reconstructed again.
Eng. Zia Hamayoun Ibrahimkhail head of public work department of Samangan said BNA correspondent, the bridge has 60m length, 7m width, 5m height and located in Dara –e-Souf Bala and Dara Souf Payeen districts highway, which with demands of local residents will be reconstructed by Ministry of Public Work as soon.
The reconstruction work of the bridge will be started in next month and to complete within six months, Ibrahimkhail added.
The financial cost of the bridge is 30 million Afghani, which allocated by Ministry of Public Work.
↧
Huge Bridge Will Be Reconstructed in Samangan
↧