Saturday, October 24, 2020
Sheberghan (BNA) Work on three utility projects began in Jawzjan. Today.
According to BNA local correspondent these projects include the construction of three ground drinking water reservoirs with stone walls and concrete roofs and the installation of a hand pump each with a volume of 200 cubic meters of water in Fatahabad village to Mardian district of Jawzjan.
These projects will be implemented at a cost 4,564,000 Afghanis with a ten percent share of the people.
During the work, a number of residents of the district will be provided with jobs and five hundred and eighty-six families will benefit from it.
T. Yarzada
↧
Hundreds of Families to Access Drinking Water
↧